The AI wave has driven a brand new data center supply chain system. In this ecosystem, VST is responsible for energy supply, providing power support for critical infrastructure. GLXY controls the connection to energy hubs and acts as the infrastructure provider for GPU resources, managing the deployment of computing power resources. Meanwhile, CRWV offers GPU computing capabilities and directly sells HPC services to ultra-large cloud vendors. The three parties each perform their duties and collaborate with each other, forming a complete business model for the next-generation data center — from energy assurance and infrastructure control to computing power output, creating an efficient closed-loop industry chain. This model signals a new direction for the era of AI infrastructure.

View Original
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
  • Reward
  • 4
  • Repost
  • Share
Comment
0/400
metaverse_hermitvip
· 10h ago
Wow, the combination of these three projects is really impressive. It feels like they've grasped the pulse of the AI era.
View OriginalReply0
TokenomicsShamanvip
· 10h ago
Wow, these three coins really closed the entire industry chain? Feels like the copying is pretty intense.
View OriginalReply0
MEV_Whisperervip
· 10h ago
Well, this division of responsibilities is indeed clear, but to be honest, it still depends on who can hold the choke point of energy.
View OriginalReply0
GateUser-ccc36bc5vip
· 10h ago
From energy to computing power in one seamless chain, this triangular synergy is truly unmatched. --- VST, GLXY, CRWV working together shows some real potential. --- A closed-loop industrial chain sounds good, but the key is whether it can be successfully implemented. --- Competition in GPU computing power is becoming increasingly fierce; whoever controls the energy has the say. --- The era of AI infrastructure has truly arrived; the old system needs to be phased out. --- No matter how good the plans sound, actual performance is what matters. Let's wait and see. --- If this model stabilizes, it could indeed change the landscape. --- Energy supply bottlenecks are a concern; VST holds significant influence. --- With the entire industrial chain connected, efficiency should improve. --- Feels a bit like discussing concepts; I wonder how it will actually play out?
View OriginalReply0
  • Pin

Trade Crypto Anywhere Anytime
qrCode
Scan to download Gate App
Community
  • 简体中文
  • English
  • Tiếng Việt
  • 繁體中文
  • Español
  • Русский
  • Français (Afrique)
  • Português (Portugal)
  • Bahasa Indonesia
  • 日本語
  • بالعربية
  • Українська
  • Português (Brasil)